Jump to content

CTG Brasil | Garibaldi HPP 43s62

Garibaldi HPP 6vp58

Garibaldi HPP 6vp58

The Garibaldi HPP is located between the cities of Abdon Batista and Cerro Negro, state of Santa Catarina, and has an installed capacity of 191.9 MW. 2z1a1a

Since the beginning of its operation in 2013, Garibaldi HPP has stood out for the development of 26 environmental and social programs to preserve the environment and promote sustainability. 9736d

4l712j

Installed capacity: 191.9 MW
Start of operation: September 24, 2013
End of concession: January 11, 2051
CTG Brasil’s share: 100%


2024 power generation: 1.103.094 MWh

On average, the plant generated energy to supply a city with about 377,000 inhabitants.

Imagem lateral da barragem aberta da Usina de Garibaldi.

Galeria de Imagens e1t4q